New York

Manhattan

Towers, townhouses, and pre-war conversions, where the constraints are landmark review, building rules, and the freight elevator schedule.

Manhattan work is defined by what the building will allow. Alteration agreements, landmark review, insurance certificates, union labor rules, and a freight elevator booked in two-hour windows all shape the schedule before a single cable is pulled.

The physical plant is unforgiving too. Pathways in pre-war construction are scarce and rarely where the drawings say, so we survey aggressively, plan riser and closet space early, and design around the pathway that actually exists rather than the one we would prefer.

In return, this is where dense infrastructure pays off most: high device counts in small footprints, tenant and visitor management at scale, and building systems that have to interoperate with whatever the property already runs.

Segment

Residential in Manhattan

Townhouses, penthouses, and full-floor residences: discreet AV, integrated shading and lighting, and security coordinated with building staff and house rules.

Planning a space?

The earlier we join, the more we can do. Bring us in during design and the infrastructure disappears into the architecture.